Delivery and Support

Faster Handoffs from Factory to Field

Delivery is where projects either stay on schedule or absorb risk. ASG Power supports the handoff with Design Engineer  Manufacture execution, Factory Acceptance Testing (FAT), documentation and packaging that arrives ready to install plus field support after shipment.

  • Factory Acceptance Testing (FAT) at ASG Facilities
  • Fast Lead Times and Quick-Turn Builds
  • Custom Packaging, Labeling and Kitting
  • Field Service, Retrofits and Warranty Support
DeliveryandSupport_NewSecondaryPhoto

Quick Answer: What does Delivery and Support include?

Delivery and Support includes pre-shipment testing and Factory Acceptance Testing (FAT) at ASG facilities, custom packaging and kitting plus post-delivery field service, engineering support and warranty coverage to support long-term performance.

Factory Acceptance Testing (FAT), Completed Before Shipment

FAT is conducted at ASG facilities and products are tested regardless of final destination, helping teams standardize acceptance across sites. FAT scope is defined up front, so issues are resolved before equipment reaches the field.

Quick Delivery and Packaging Built for Real-World Handling

Speed comes from clear release milestones, component planning and disciplined build execution. Packaging is treated as part of the deliverable, with options for custom crating, labeling and kitting to reduce receiving time and install-time sorting.

Field Service, Retrofits and Long-Term Coverage

ASG Power supports commissioning and startup needs, field troubleshooting and retrofit upgrades for existing power and control equipment. Engineering support and warranty coverage help maintain performance as requirements evolve.

Lifecycle Support for Contract Assembly Programs

For OEM and integrator programs, ASG Power supports long-term builds as a contract assembler, including roadmap planning, revision control and repeatable documentation to keep quality consistent across product generations.